← All productsProduct 02

Synchronization Panels

DG synchronization, AMF and load-sharing solutions for coordinated power management.

Synchronization Panels

What it does and
why it is used.

Synchronization panels coordinate generator and mains operation around the required control philosophy. The range includes DG synchronization, AMF, load-sharing and PLC-based solutions for project-specific power management.

Automatically coordinates mains and generator sources so that power can be transferred, synchronized and shared safely. The panel monitors voltage, frequency, phase sequence and source availability before allowing breaker operations.

  • DG synchronization panels
  • AMF panels
  • Load-sharing panels
  • PLC-based solutions
  • Control and indication
  • Custom engineered panels
  • Standby power systems
  • Commercial facilities
  • Industrial power management
  • Multi-generator installations

Engineering reference.

Indicative capability for initial product selection. Final ratings, dimensions, materials, protection, component makes and construction are confirmed against the approved SLD, BOQ, drawings, load data and site conditions.

Control supplySelected to suit project control philosophy
System voltageTypically 415 V AC, 3-phase, 4-wire, 50 Hz
Source configurationMains + DG or multi-DG, project-specific
Synchronization checksVoltage, frequency, phase angle and phase sequence
Operating modesAuto / manual / test, as required
ControllerDedicated synchronizing controller or PLC-based logic
Load managementkW/kVAr sharing, sequencing and load-dependent start/stop
ProtectionElectrical/mechanical interlocks and breaker supervision
IndicationMeters, status lamps, alarms and optional HMI
CommunicationOptional Modbus/BMS/SCADA interface
EnclosureIndoor or outdoor construction to approved IP requirement
TestingLogic, interlock and functional sequence verification

Built for real-world
electrical infrastructure.

Key use cases

  • Automatic mains-failure operation
  • Synchronization of multiple DG sets
  • Mains and DG changeover control
  • Active and reactive load sharing
  • Priority-based generator sequencing
  • PLC/HMI-based monitoring and annunciation

Typical installation areas

  • Hospitals and critical-care facilities
  • Data centres and telecom sites
  • Hotels, malls and commercial campuses
  • Manufacturing and process plants
  • Airports and infrastructure facilities
  • Sites using multiple standby generators
06

For an accurate technical proposal

Share the SLD, BOQ, load schedule, fault level, cable schedule, approved makes and layout drawings. Our engineering team will review the requirement and propose the appropriate configuration.

Request product quote

Start a conversation

Have a project in mind?
Let's engineer it right.

Share your SLD, BOQ or project requirement. Our team will respond with the right technical direction.